Tell me the integration of MM-PM , and generallyin
what type of scenarios, and in which industries .
The integration aspects of MM-PM are:
1) for non stock materials requirement, purchase
requsition can be created from the plant maintenance order. PR is converted to
the Purchase order. when ever goods receipt is done , the cost is directly
booked to the plant maintenace order.
2) for stock materials requirement,,reservation can be
created from the plant maintenance order and the material can be issued to the
order against the reservation.
3) Like materials , for services also PRs can be created
from the plant maintenace order.
Another integration is BOM - Bill Of Material.
With Equipment BOM, you can create a list of material
through which equipment is created or in othre words you can mention the spares
that you may require during the maintenance of the equipment.
FICO-MM-PM Integration
Explain the integration points between PM and
MM/FICO during the PM configuration.
Below are some integration aspects:
Integration with MM:
1.Material master record for Batch Managed material as
Equipment
2.Reservations and Goods Issue for Maintenance Order
3.Material valuation class/types for refurbishment
materials as equipment
4.Triggering PR from Maintenance Order
Integration with FICO:
1.Asset/Sub-Asset numbering in Equipment Master Data
2.Activity based costing for Operations performed through
Maintenance Order
3.Settlement of accrued costs in Maintenance Order to G/L
Account,Cost Center, Asset etc.,